- Preparing components for Installation :
- Installation of materials for the printing order must be done before the press lights are turned on
- Review the planning schedule in Labeltraax to determine priority production of jobs.
- Update the planning board with current information on the status of the job preparation
- Check the job ticket and verify the plate number and the conformity of all related components.
- Select the appropriate plate bag from plate storage and cross reference details to ensure components are correct.
- Mount plates on to cylinders.
- Cut sticky back for cylinder
- Retrieve the right die from storage and place on cart with plate bag and cylinder.
- Install or assist with installing dies, cylinders and other components into the press.
q Removal of components :
- Assist with removing components from the press at the completion of each job
- Clean up the press and components and return material etc. to storage.
- Remove all plates with care and place in plate washer.
- Check washed plates for defects before placing into the plate bag and Jaleema folder
- Verify all plates from the job are accounted for, cleaned and returned to plate the bag with the finished rolls
- Clean if necessary, the Ink Room, the die and store them by numerical number
- Distribute clean rags to each press throughout the week
- Empties garbage on consistent basis throughout all shifts
- All other duties as assigned